Project

Century Plywood Ltd, Joka

Project Capacity

1.5 MW

Job Role

Installation and Commissioning

Description

The Century Plywood Ltd. project at Joka is a large-scale industrial solar installation with a capacity of 1.5 MW, developed to support high energy consumption requirements and improve sustainability in manufacturing operations.

Successful Completed Project

SM Solar Solution successfully completed the installation and commissioning of the solar power system, ensuring smooth implementation and efficient integration with industrial operations.

Problem

The industry required a solution to reduce high electricity expenses, improve energy efficiency, and minimize dependency on conventional power sources.

Solution

A high-capacity solar installation was implemented to support large-scale power demand and provide long-term energy savings.

Process

  • Site inspection and energy assessment
  • System planning and design
  • Solar installation execution
  • Testing and commissioning
  • Final performance verification

Conclusion

The project successfully enhanced energy efficiency and strengthened sustainable industrial operations.